• Skip to primary navigation
  • Skip to main content
  • Skip to footer

Environmental, Construction, Munitions and Logistics Services in Alaska and Nationwide

Leaders in logistically complex projects in rural Alaska and remote locations nationwide.

Brice was built on family values. That means we've got your back.

  • Home
  • About
    • Get To Know Us
    • Safety Program
    • Business Information
    • Qualifications
    • Brice – the Backstory
    • Current Timeline
  • Services
    • Environmental
      • Environmental Support Services
    • Construction
    • Munitions
    • Logistics
    • Aerial Imaging
  • Projects
    • All Projects
    • Project Map
  • Careers
  • News
    • News
    • Published Articles
  • Contact

Construction

Hangar Demolition, Eareckson AS, Shemya, Alaska

August 5, 2020

Brice performed the demolition of three unoccupied, dilapidated and decayed wooden hangars whose original construction dated back to World War II. Shemya Island’s harsh climate had damaged the hangars beyond repair. The hangars posed an environmental risk and occupied land that could be used in the future to support the EAS mission. Our scope of Read More

ACHE Installation & Setup, Eareckson Air Station, Alaska

October 22, 2019

Brice installed 14 new GFE (Government Furnished Equipment) USA Coil Air-cooled Heat Exchanger (ACHE) systems and associated piping, control valves, wiring and sensors that will eventually replace the legacy ACHES at Eareckson Air Station (EAS). The ACHEs are installed as part of the radar cooling system. Brice designed the plumbing and electrical systems for the Read More

NEXION System Installation at Eareckson Air Station, Alaska

December 17, 2018

In support of Northrop Grumman (NG) Mission Systems (NGMS), Brice installed a new Next Generation Ionosonde (NEXION) system at Eareckson Air Station (EAS), in Shemya, Alaska. The NEXION system monitors the ionosphere and its effect on radar communication systems. We installed the system consisting of a 101’ transmit antenna tower, an array of four receive Read More

Demolition of Hangars 2, 3, and 4 at Eareckson Air Station, Alaska

December 17, 2018

Brice demolished vacant hangars 2, 3, and 4 at Eareckson Air Station (EAS) at Shemya, Alaska. The hangars are decades old, unoccupied, dilapidated and decayed as a result of the harsh weather and climate of Shemya Island. Demolition included utilities, miscellaneous appurtenances, and foundation slabs. Brice first performed asbestos abatement and provided a Notice to Read More

Eareckson Air Station Power Plant Roof Repair

December 17, 2018

Eareckson Air Station (EAS) is located on Shemya Island, a windswept island at the western end of the Aleutian Island chain, ~1,500 air miles southwest of Anchorage, Alaska. Fog, blowing rain and/or snow with temperatures ranging from 20 to 40 degrees are common throughout the year. These conditions often contribute to the rapid deterioration of Read More

Water Distribution System, Wake Island Airfield

October 29, 2018

Brice is performing the design-build construction of the Water Distribution System on Wake Island. The water distribution had been deteriorating after years of use and from the salt corrosion typical of island environments. Our design work consisted of the review of a 100% design provided by the client. Working with our engineer of record, we Read More

Missile Defense Agency Facilities, Wake Island Airfield

October 29, 2018

Brice performed the construction and renovation of five MDA buildings located on Wake Island including construction of a 2,000 square-foot Flight Test Communications Facility and the Peacock Point Communications Terminal Facility, and the modernization/upgrade of Building 1607 (Storage Building), 1615 and 1654 (Missile Storage Buildings). The new Flight Test Communications Facility will house flight test Read More

Solar Array Site/Civil Services, Wake Island Airfield

October 3, 2018

Brice is performing site civil work in support of Wood PLC’s prime contract to upgrade electrical infrastructure and install a 750-kilowatt solar array on Wake Island Airfield. Specifically, Brice is installing 2-3 miles of new primary conduit, up to ½ mile of secondary conduit, and 208 vaults and pads. We will also establish a 39-person Read More

Design-Build Construction, Wake Island Airfield

September 28, 2017

Brice is performing the design build reconstruction of the Building 1503 Emergency Generator Building, and repair of two buildings (Buildings 1502 Terminal Building and 1104 Dining Facility) located on Wake Island. The buildings were deteriorating after years of use and from salt corrosion typical of island environments. Our design work consisted of the review of Read More

Fuel Pier Facility Repair, Eareckson Air Station, Shemya Island, Alaska

September 28, 2017

Brice performed a design-build project at Eareckson Air Station (EAS) fuel pier to ensure that vital fuel and supplies could be safely offloaded on Shemya Island. EAS serves as an Air Force refueling station as well as an intercontinental emergency landing strip for commercial air traffic crossing the Pacific Ocean. The EAS fuel pier was Read More

  • Go to page 1
  • Go to page 2
  • Go to Next Page »

Footer

Featured Projects

  • View More Projects >
  • Family Built
  • Excellence Delivered
  • Uniquely Agile
Top

  Proud Subsidiary of Calista Corporation
Copyright © 2022 • Brice Environmental Services Corporation • All rights reserved. Website by Sundog Media, LLC Logo Sundog Media, LLC.